Project Energy Connect L4Asset Owner Transgrid
Client Elecnor Project Summary Gateway Energy were selected to provide the pole structures for the new 220kV double circuit twin Paw Paw 220kV line connecting Red Cliff Substation in Victoria to Buronga Substation (the largest in the Southern Hemisphere) in NSW, including some tall Murray River crossing structures, due to our reputation as a high-quality solutions and product supplier. The project has expanded into other supplies given our technical expertise and service-driven business including; stubs for 500kV towers, 330kV poles and other poles for cut-ins. We also supplied cut-in and substation structures on the SA end at Robertstown Substation for CPP and ElectraNet. |
Enerven Goyder AugmentationAsset Owner ElectraNet
Client Enerven Project Summary Design and supply of 2 x 275kV specific high-strength flange-jointed poles to facilitate a 275kV under-crossing for the Goyder Wind Farm project, by lifting the existing line and offsetting them to allow one circuit to stay live while the other was constructed quickly under outage conditions. |
Olive Downs Transmission LineAsset Owner Pembroke
Client Yurika Project Summary Connecting the 132/66kV Broadlea substation to the new 66/11kV Pembroke Olive Downs substation is a 45km line of ~148 poles and 1 gantry manufactured by Gateway Energy. The remote Queensland site is located approximately 40kms from Moranbah, where the poles were delivered to site ready for installation. |
Junee 66kV Line Rebuild, NSWAsset Owner Essential Energy
Client Yurika Project Summary 30 x 66kV single circuit intermediates and vertical strains. Provided a value-added solution combining foundation designs with poles for most economical total project cost. Supplied additional 4 x substation poles for gantries in lieu of concrete poles. |
Dundonnell Wind Farm Connection, VICAsset Owner AusNet Services for Tilt Renewables
Client Downer Project Summary ~200 x 220kV double circuit base plate and 220kV single circuit embedded poles, undercrossing gantries. Underwent full scale load testing on a number of structure types. High strength crossarm design fully modelled in Strand7 for double circuit strains. |
99F Transmission Line Upgrade, Wagga NSWAsset Owner TransGrid
Client Downer Project Summary ~580 base plate 132kV poles. Delivered all foundation components early for seamless construction of the 100km project. Poles were designed to enable the standard C-section crossarm to be used with the connection designed and a full-scale model used to test that the crossarms could fail without damaging the pole connection. Poles were dulled (de-glared) finish. |
Moorabool Wind Farm 132kV Connection, VICAsset Owner Tilt Renewables
Client Beon Energy Solutions Project Summary ~200 x 132kV poles and gantries for the connection. Another successful steel pole transmission line project for Beon. We bundled 315km of Selenium AAAC with the poles for lower total project outturn cost. |